NetRiver Facility Upgrades

Lynnwood, WA

Principal-in-charge: Chevy Chase, PE, SE
Project Manager: Joe Galusha, PE, SE, LEED AP

Structural Elements:
Tenant Improvements
Mechanical equipment additions

CG Engineering provided structural design for the redesign of an existing facility to change the use of the 2nd floor space from office space into equipment space. The project also included a small addition to the building. The roof and floor systems were analyzed and retrofitted to accommodate new loads and the addition was seismically separated from the building with a seismic joint. 