Genadiev Townhomes

Shoreline, WA

Principal-in-charge: Greg Guillen, PE, SE
Structural Project Manager: Mike Maechler, PE, SE
Civil Project Manager: Jared Underbrink, PE
Planner: Carmel Gregory

CG Engineering helped develop three townhome sites for Genadiev LLC in Shoreline, with a total of 16 townhome units in small clusters. The sites were designed to maximize density as incentivized by Shoreline’s light rail station-area upzoning. CG Engineering provided planning, civil engineering and structural engineering, and managed permitting and platting for all three sites. Construction of the first site was completed in 2024.

Contact Us

250 4th Ave S Suite 200 Edmonds, WA 98020

1910 Bickford Ave Suite G Snohomish, WA 98290

425.778.8500