Master Precaster Warehouse

Woodinville, WA

Principal-in-charge: Greg Guillen, PE, SE
Structural Project Manager: Joe Galusha, PE, SE

Structural Elements:
CMU Building
Heavy wooden trusses

Civil Elements:
Street improvements
Water and sewer
Erosion control
Grading and drainage

CG Engineering provided the civil and structural design for this building addition and renovation project. The existing structure was a 12,000 square foot single-story CMU building with heavy wooden roof trusses spanning from wall-to-wall on a 1.84 acre site. Because of the age of the existing building, the additions were designed to carry all of the lateral loads from the existing structure as well as the new additions. During construction, the owner requested additional features to the project. CG Engineering provided the design of a ramp, wash bays for vehicles, additional pump systems, and improvements to the street beyond the City of Puyallup’s initial requirements.

Contact Us

250 4th Ave S Suite 200 Edmonds, WA 98020

1910 Bickford Ave Suite G Snohomish, WA 98290

425.778.8500