Slidewaters Surf Wave
Chelan, WAPrincipal-in-charge: Chevy Chase, PE, SE
Structural Project Manager: Mike Maechler, PE, SE
Structural Elements:
Concrete
CG Engineering provided structural engineering for a massive concrete basin that holds a 720-yard surf wave pool. The concrete basin is also constructed with a partial lid that serves as a viewing platform with stadium seating for spectators. The lid included access points for the pumps below and a pump room. The project also included engineering for a promenade, grand staircase and various landscape elements for the surf wave attraction.