Holy Apostles Church

Shoreline, WA

Structural Elements:
Detention vault design
Prestressed concrete
Building addition

Civil Elements:
Stormwater infrastructure

CG Engineering provided civil and structural engineering services for the expansion and renovation of an existing church campus in Shoreline, Washington. The project included building additions, new pedestrian walkways, parking lot improvements, and underground stormwater infrastructure. Our team developed grading, drainage, utility, and site development plans to support the campus improvements and meet City of Shoreline requirements.

Structural engineering services included the design of a large underground stormwater detention vault utilizing precast prestressed concrete panels with geofoam to accommodate the site’s sloping terrain. CG Engineering provided the structural calculations and construction drawings required for permitting and construction.

Contact Us

250 4th Ave S Suite 200 Edmonds, WA 98020

1910 Bickford Ave Suite G Snohomish, WA 98290

425.778.8500