Slidewaters Lazy River
Chelan, WAPrincipal-in-charge: Chevy Chase, PE, SE
Structural Project Manager: Mike Maechler, PE, SE
Structural Elements:
Peer review
Foundation design
Wood framed construction
CG Engineering provided structural engineering review of the concrete details and provided input for the control and construction joints for the Slidewaters Lazy River. CG also provided the structural design for the framing and foundation of the pedestrian bridge over the Lazy River. The deliverable included plans, details and stamped structural calculations.