MacKaye Harbor Pier

Lopez Island, WA
Principal-in-charge: Chevy Chase, PE, SE
Structural Project Manager: Dennis Titus, PE, SE

Structural Elements:
JARPA permit
Wood and steel

CG Engineering provided structural design for the renovation of an existing 12’ by 800’ pier. The Army Corp of Engineers required an “after the fact” permit due to previous work without a permit. This required a JARPA permit application & coordination with state & federal agencies. The final product was a mixed wood and steel grated deck with floats at one end.

Contact Us

250 4th Ave S Suite 200 Edmonds, WA 98020

1910 Bickford Ave Suite G Snohomish, WA 98290

425.778.8500