Log Boom Park Pedestrian Bridge

Kenmore, WA

Principal-in-charge: Chevy Chase, PE, SE
Structural Project Manager: Mike Maechler, PE, SE

Structural Elements:
Concrete abutments

CG Engineering provided structural engineering for a new pedestrian bridge between the park an adjacent marina, across the mouth of a stream flowing into Lake Washington. The project included design of concrete approach ramps and abutments to connect the marina boardwalk and park sidewalk on either side of the bridge.

Contact Us

250 4th Ave S Suite 200 Edmonds, WA 98020

1910 Bickford Ave Suite G Snohomish, WA 98290

425.778.8500