El Dorado Retirement Community

Burien, WA
Principal-in-charge: Greg Guillen, PE, SE
Structural Project Manager: Joe Galusha, PE, SE
Civil Project Manager: Jared Underbrink, PE

Structural Elements:
Building redevelopment
Wood framed construction
Detention vault design

Civil Elements:
Infiltration trenches and drywells
Storm main extension
Utility improvements
Road widening and frontage upgrades

CG Engineering provided the civil and structural engineering for this two phase redevelopment of an assisted living building. The single story building was demolished and a new building with 102 units with two story and three story portions was constructed. Plans were detailed so that residents could remain in half of the existing building while construction occurred. To meet city requirements, SW 134th Street was widened and the frontage was upgraded.