Carlson Bridge Repair

Lynnwood, WA

Principal-in-charge: Greg Guillen, PE, SE
Project Manager: Dennis Titus, PE, SE

Structural Elements:
Temporary shoring
Pile-supported foundations

Civil Elements:
Drainage systems

CG Engineering provided structural and civil engineering services for a property that needed to replace a bridge over Swamp Creek to access their existing residence.  CG provided the temporary shoring required for the existing bridge until the new bridge could be permitted and installed. CG Engineering provided the permitting management with Snohomish County and the Tribes for the bridge replacement. The bridge needed 4 feet of clearance from Swamp Creek to meet fish passage requirements and the bridge abutments required pile-supported concrete foundations.  The width of the new bridge needed to be widened to 16 feet to meet the fire access requirements. New drainage systems were designed to handle off-site street drainage impacts.

.

 

Contact Us

250 4th Ave S Suite 200 Edmonds, WA 98020

1910 Bickford Ave Suite G Snohomish, WA 98290

425.778.8500