AWWD Lift Station

Lynnwood, WA

Principal-in-charge: Chevy Chase, PE, SE
Structural Project Manager: Joe Galusha, PE, SE

Structural Elements:
Reinforced concrete
CMU building

CG Engineering provided structural engineering for a lift station including an above-ground control building and at-grade generator slab. The structural drawings included schedules, sections and details. Joe coordinated with the prime consultant and other design team members to prepare 60%, 90%,100% and bid-ready specifications and cost estimates and responded to building department comments.