Mercedes Benz of Lynnwood

Lynnwood, WA

Principal-in-charge: Chevy Chase, PE, SE
Structural Project Manager: Joe Galusha, PE, SE
Civil Project Manager: Jared Underbrink, PE

Structural Elements:
Detention vaults
Steel framed construction

Civil Elements:
Low-impact design
Stormwater management

CG Engineering provided civil and structural engineering for a new Mercedes Benz dealership in the City of Lynnwood. The building is one-story, approximately 42,000 square feet with a showroom, a service area and a small mezzanine. The showroom area is a 35 foot tall steel framed structure with a metal deck roof. The site is approximately 3.5 acres and has a critical area. To handle increased flows due to the addition of impervious areas, a structural detention vault was designed. To minimize the size and cost of the vault, rain gardens were designed to account for significant portions of the site runoff.

Contact Us

250 4th Ave S Suite 200 Edmonds, WA 98020

1910 Bickford Ave Suite G Snohomish, WA 98290

425.778.8500