Reserve at SeaTac

SeaTac, WA

Principal-in-charge: Chevy Chase, PE, SE
Structural Project Manager: Mike Maechler, PE, SE
Civil Project Manager: Jared Underbrink, PE
Planner: Carmel Gregory

Structural Elements:
Post-tensioned concrete
Wood framed construction

Civil Elements:
2.85 acre site
Low-impact design
Stormwater management

CG Engineering provided pre-development services, civil and structural engineering and construction services for this 5-story, 285-unit affordable senior housing building with attached parking garage near the future Angle Lake Station and light-rail line. It featured strong transit-oriented development elements. Our planner provided project review, zoning code interpretation, and coordination with the jurisdiction through pre-development, permitting, and construction. She also helped select and locate public art for the building.

Contact Us

250 4th Ave S Suite 200 Edmonds, WA 98020

1910 Bickford Ave Suite G Snohomish, WA 98290

425.778.8500