Swift Reservoir Fish Collector Platform
Swift Dam, WAPrincipal-in-charge: Greg Guillen, PE, SE
Structural Elements:
Floating platform
Grating, handrails and floor support
Fish passage
CG Engineering provided structural engineering for fish passage flumes and troughs, catwalks, handrails, grating, floor-support for this $63 million fish collector platform and release facility downstream. The 1,500-ton floating fish collection platform measures 170’ by 60’ and is attached to a 660’ trestle that juts out from the Swift Dam on Swift Reservoir..