New Beginnings Christian Fellowship
Renton, WAPrincipal-in-charge: Chevy Chase, PE, SE
Structural Project Manager: Carolyn Jewett, PE, SE
Structural Elements:
Seismic upgrades
Mezzanines
Mechanical equipment connections
CG Engineering designed modifications to change this 36,000 square foot prefabricated metal building into a church. Two structurally independent mezzanines were added for 3,700 square foot of second floor classrooms. Foundations were added for a 4,300 square foot future classroom mezzanine. CG provided construction services by reviewing shop drawings, performing field visits, and designing modifications due to unforeseeable existing field conditions.