Edgewater Inn Pier Repair
Seattle, WAPrincipal-in-charge: Chevy Chase, PE, SE
Structural Elements:
Structural assessment
Condition report
Dry rot repair design
CG Engineering provided structural condition assessment and repair design of a portion of the timber pier and the hotel decks on three stories of the west face of the hotel, which contained significant dry rot.