CG Engineering, civil and structural engineering and planning for residential and commercial projects

Silver Dental Building

Seattle, WA

Principal-in-charge: Chevy Chase, PE, SE

Structural Elements:
CMU and metal stud walls
Building relocation

CG Engineering designed this two-story, 6,800 square foot dental office and retail building. A portion of the second floor and roof were an existing metal stud building on a different site. The front portion of the building and all the lower floor walls and columns were built and the existing building was set in place.