CG Engineering, civil and structural engineering and planning for residential and commercial projects

MacKaye Harbor Pier

Tulalip Reservation, Lopez Island, WA

Principal-in-charge: Chevy Chase, PE, SE
Structural Project Manager: Dennis Titus, PE, SE

Structural Elements:
JARPA permit
Wood and steel

CG Engineering provided structural design for the renovation of an existing 12’ by 800’ pier. The Army Corp of Engineers required an “after the fact” permit due to previous work without a permit. This required a JARPA permit application & coordination with state & federal agencies. The final product was a mixed wood and steel grated deck with floats at one end.