City of Snohomish Retaining Wall

Snohomish, WA

Principal-in-charge: Greg Guillen, PE, SE
Civil Project Manager: Jared Underbrink, PE

Structural Elements:
Retaining wall and stairs

Civil Elements:
Regrading
Stormwater management

CG Engineering provided civil and structural design for the replacement of approx. 215 ft. of retaining wall. The stairs to the adjacent residence were replaced, along with the curb, gutter, planting strip, and sidewalk. The slope behind the wall was re-graded. A drainage system was installed behind the wall and tied into the existing storm water conveyance system.